Energy
Choose state
In progress
Finished
Energy
Ostrołęka C Power Plant - construction works
Contract value:
PLN 609 million net
Completion date:
33 months
Energy
Reserve heat source 132 MW heating plant in Elektrociepłownia Stalowa Wola S.A.
Contract value:
55 mln PLN gross
Completion date:
15 months
Energy
Construction of power units in Opole Power Plant
Energy
Thermal insulation of block No. 10 in Łagisza Power Plant
Energy
Modernisation of 3 power units in Turów Power Plant in Bogatynia
Energy
Heat Recovery System from the exhaust of the K6 biomass boiler in the Białystok Co-Generation Plant
Energy
Construction of biomass feeding system to the boiler no. 2 in PGE Elektrownia Opole SA
Energy
Construction of biomass feeding system to the reconstructed OF-135 BFB unit in EC Tychy
Eco-friendly
The biomass-fuelled energy-production unit with the capacity of 20 MWe for ENERGA Kogeneracja in Elbląg.
Eco-friendly
Expansion of the existing coal boiler with a boiler for biofuel with a capacity of about 3 MW using diaphgram walls technology
Eco-friendly
Design and construction of biomass boiler feeding system without milling in Power Plant B
Eco-friendly
Design, construction, supply of machinery and equipment, on-site assembly, start-up and commissioning of an oil and gas boiler system in the turnkey formula in Heat and Power Plant "Zielona Góra" SA