Energy

Thermal insulation of block No. 10 in Łagisza Power Plant

As part of the project, Mostostal Warszawa is responsible forthe construction and execution of technological connections and heat exchangers with a total thermal power of 150 MWt, as well as the construction of heating pipelines connecting the designed heat exchangers with the existing heating water network in the power plant and modernization of the existing central heating station. The installation will allow the use of steam from the turbine flow system of the power plant.

The installation of thermal insulation will secure the supply of thermal energy for the region. Until now, thermal energy produced for this region came from heating stations supplied by units No. 6 and No 7 of the Power Plant. In 2019, there units are planned to be excluded from operation.

Contract value: PLN 66.08 million gross
Date of signing the contract: 05/09/2018
Deadline: 15 months from the moment of signing the contract