Energy
Gas desulpharisation system for Ciepłownia Gliwice
The contract for the realization of the tasj was signed 12th February 2007. The scope of works included construction of two installations: one for WP-70 boilers and the second for WR-25 boilers. The installations were produced using dry scrubbing method (spray drying) based on technology of AMK Kraków.
- Investor: Przedsiębiorstwo Energetyki Cieplnej Sp. z o.o.
- Contractor: AMK Kraków S.A.
- Contract value: PLN 46,34 mln
- Implementation period: 2007–2008
- Country: Poland
- Voivodeship: Silesia