Energy

Gas desulpharisation system for Ciepłownia Gliwice

The contract for the realization of the tasj was signed 12th February 2007. The scope of works included construction of two installations: one for WP-70 boilers and the second for WR-25 boilers. The installations were produced using dry scrubbing method  (spray drying) based on technology of AMK Kraków.

  • Investor: Przedsiębiorstwo Energetyki Cieplnej Sp. z o.o.
  • Contractor: AMK Kraków S.A.
  • Contract value: PLN 46,34 mln
  • Implementation period:  2007–2008
  • Country: Poland
  • Voivodeship: Silesia