Acciona Mostostal Warszawa is part of the Acciona Capital Group.

References

Zarząd Dróg Miejskich Warszawa
The Municipal Roads Authority (Zarząd Dróg Miejskich) ul. Chmielna 120 00-801 Warsaw states that Mostostal Warszawa S.A. performed work on time and with due diligence.
Zarząd Dróg Miejskich Warszawa
Municipal Roads Authority, ul. Chmielna 120 00-801 Warsaw states that Mostostal Warszawa S.A. performed the work on time and with due diligence.
Acciona Nieruchomości
The work has been carried out with due diligence and timeliness. The engineering and technical staff are highly qualified and this allows us to recommend Mostostal Warszawa SA as an experienced and competent general contractor.
Acciona Nieruchomości Sp. z o.o.
The work was carried out with due diligence and timeliness. This is confirmed by the high qualifications of the engineering and technical staff and this allows us to recommend Mostostal Warszawa S.A. as an experienced and competent Contractor.
GDDKiA Oddział w Gdańsku
The work that was commissioned was performed with due diligence
Zarząd Dróg Miejskich
The work was carried out in accordance with the terms of the agreement.
ZGK Zakroczym
The device fully meets our expectations.
PPH "Orion"
The work was carried out with due diligence and timeliness. This is confirmed by the high qualifications of the engineering and technical staff and this allows us to recommend Mostostal Warszawa SA as an experienced and competent general building contractor.
Acciona Nieruchomości Sp. z o.o.
The work was carried out with due diligence and timeliness. This is confirmed by the high qualifications of the engineering and technical staff and this allows us to recommend the company as an experienced and competent General Contractor.
Lubelski Zarząd Drogowych Przejść Granicznych
Project documentation and building work, as well as other related services, were carried out with due care in accordance with applicable law, the contract and the expectations of the customer. All deadlines specified in the schedule were met. The contractor performed high quality work.
Uniwersytet Zielonogórski
The work was carried out with due diligence. This is confirmed by the high qualifications of the engineering and technical staff and this allows us to recommend Mostostal Warszawa S.A. as an experienced and competent Contractor.
Prezydent Miasta Krosna
The work was completed on time and with due diligence.
Wojskowe Towarzystwo Budownictwa Społecznego "Kwatera"
The work was completed with due diligence, within the contractual period. This is confirmed by the high qualifications of the engineering and technical staff and this allows us to recommend Mostostal Warszawa S.A. as an experienced and competent General Contractor.
Zarząd Dróg Miejskich Warszawa
During the execution of the contract, Mostostal Warszawa S.A. established itself as a reliable, responsible and solid contractor, adhering to quality standards and contractual terms. The completion of the contract 1.5 months before the contractual deadline confirmed the high technical and staff potential of the contractor.
IKEA Polska
The work was carried out with due care within the agreed period, while maintaining the required quality standards and meeting the requirements of the investor.
Polskie Koleje Państwowe S.A.
The quality of the work performed by Mostostal Warszawa S.A. meets all the requirements of the Technical Specification and is assessed as good. The very good cooperation between the construction management and the PLK Plant in Siedlce and PLK Exploitation Section in Biała Podlaska aimed at proper operation of the railway station in Terespol during the reconstruction deserves praise.
Zakład Budownictwa Mostowego Inwestor Zastępczy Sp. z o.o.
Given the progress of the work, the organisation of work, competency management and engineering, the technical level and the quality of the work should be highly evaluated. A clear positive impact on the work is the ISO 9001 TUV Certificate held by the company and the usefulness of the procedures applied as part of the Certificate. The positive evaluation of our cooperation during work on the Siekierkowski Bridge allows us to express the opinion that Mostostal Warszawa S.A. is a partner worthy of cooperation and trust.
GDDKiA Oddział w Katowicach
Work under the contract was performed in accordance with the technical documentation and with prevailing standards for GP-class national roads. The deadline was met and the final acceptance has been performed.
Urząd Miasta Włocławek
The work was performed in accordance with the scope and costs resulting from the Conditions of Contract.
Zarząd Dróg i Transportu
The work was performed in accordance with the scope and costs resulting from the Conditions of Contract. The beneficiaries have no reservations about the quality of the work that was carried out.
Elektrim Megadex S.A.
The work entrusted to Mostostal Warszawa S.A. was carried out in a professional manner, in accordance with the technical documentation and performed by professional engineering and technical staff.
Mostostal Invest Sp. z o.o.
Thanks to its experience and reliability, Mostostal Warszawa S.A. has done its job on time and with an appropriate level of quality.
PKP Polskie Linie Kolejowe S.A
The whole range of work entrusted to Mostostal Warszawa SA was carried out in a professional manner, in accordance with the technical documentation and the schedule while maintaining a high quality of work. Particular recognition should be given to the professional approach of the engineering and technical staff, their ability to cooperate with all those involved in the task and with the investor and the excellent coordination of the work of all the contractors.
GDDKiA Oddział w Rzeszowie
We conclude that the work on the above contract was performed within the contractual period, with due diligence, according to the technical documentation and the requirements of the detailed technical specifications.