Eco-friendly
Flood protection for the city of Gołdap
The scope of our work included:
- construction of a front dam and a weir at km 64+300 of the Gołdap River;
- shaping the retention tank with a surface area of 23.8 ha;
- construction of fish ladders;
- band drainage system around buildings located below the estimated level of ground water, along with a pumping station and drainage outlets;
- construction of an exit road from the public road along with access to the weir;
- construction of an overhead power line over the Gołdap River and execution of electric connections to the groundwater pumping station.
Date of signing the agreement: 22 July 2010
Date of commissioning the facility: 24 October 2012
- Investor: Management Board for Melioration and Water Devices in Olsztyn
- Contractor: Mostostal Warszawa
- Contract value: PLN 7.0 million
Period of implementation: 2010 - 2012
Selected projects
Faculty of Architecture and Faculty of Engineering Management of the Poznań University of Technology
Total surface:
19 931 m2
Contract value:
71 875 790,22 PLN gross
Completion date:
18 months