
General
SANSARA - residential complex at Górczewska 228
The investment comissioned by Bemowo Invest 3 covered construction of six residential buildings with underground garages. Mostostal performed all internal installation systems in every object. The construction was divided in three stages. The first one was to construct three 11-storey buildings type A in which at the ground floor where located office rooms apart from flats. In the second stage were erected three, 8-storey buildings type B. Buildings A1 and B1 were linked with two-level pavillion with entrance to the entire complex in which on the first floor was located office room. The total surface of six buildings with 386 flats is aproximately 47 000 m2. The net contract value is PLN 94,21 mln.
- Investor: Bemowo Invest 3 sp. z o.o.
- Contractor: Mostostal Warszawa S.A.
- Contract value: PLN 94,2 mln
- Implementation period: 2008–2009
- Country: Poland
- Voivodeship: mazovian
Total area: 480 m2
Contract Value: 8 887 mln PLN net (10 931 010 mln PLN gross)
Deadline for completion: 1 September 2026

Contract Value: 314,6 mln PLN gross
Deadline for completion: June 30, 2028

Contract Value: 48,85 mln EUR net
Deadline for completion: 30.09.2026

Total area: 5,966 m2
Contract Value: PLN 95.35 million gross
Deadline for completion: Within 36 months from the date of signing the contract

Contract Value: PLN 61.87 million
Deadline for completion: up to 21 months

Contract Value: PLN 65,30 million net
Deadline for completion: until August 18, 2023

Kraków Airport
