General

Warehouse of finished products in Kostrzyń upon Odra River

The contract included construction of high storage warehouse, dimensions 169,37 x 70,72 m and 36 m high with adjoining buildings for loading and shipping products, office, welfare, technical facilities and a building for lorry drivers. Maneuvering area and parking lots for lorries are located from the eastern and southern side of mentioned buildings. The warehouse was also equipped in installations such as: sewerage, drainage, water supply, heating, ventilation, air-conditioning, sprinkler system, hydrant system, power, lighting, SAP system and lightning protection. 

Usable area: 23 777,70 m2 
Cubic volume: 736 179,00 m3 
Area of roads and squares: 17 784,00 m2
Date of signing the agreement: 02.06.2009
Implementation period: 06.2009  07.2010

 

Investor: ICT Poland Sp. z o.o.

Contractor: Wrobis S.A.

Contract value: PLN 30,07 mln

Implementation period: 2009–2010

Country: Poland

Voivodeship: lubuskie

Selected projects