Building for scientific and laboratory use, AGH University of Science and Technology

Contract value: PLN 22 593 259.13 net
The designed facility will be used by the Oil and Gas Drilling Department and the Faculty of Electrical Engineering, Automatics, Information Technology and Biomedical Engineering of the AGH University of Science and Technology. The building was designed as a building with five aboveground and one underground storeys, on the projection of an elongated rectangle.
At the cellar level will be located laboratories associated only with the Oil and Gas Drilling Department, the upper storey will be divided between the departments of Oil and Gas Drilling Department and Faculty of Electrical Engineering, Automatics, Information Technology and Biomedical Engineering.
The usable area of ​​the building is 2757.22 m2.
 
Construction: A science and laboratory building located on the eastern side of the existing S-1 building
Investor: AGH University of Science and Technology in Krakow
General Contractor: Mostostal Warszawa SA, Southern Division
The date of signing the contract: 28/06/2018
Deadline: 15/11/2019
Contract Director: Artur Sikora
Site manager: Mariusz Rudnik
Value of the contract: PLN 22 593 259.13 net