General

The Wolin Ringroad within the national road no. 3 Świnoujście - Szczecin

The bridge works included construction of the following:

• 2 reinforced concrete flyovers with a length of 230 m and 200 m with prestressed longitudinal cables;

• steel-reinforced concrete composite structure flyovers with a length of 372 m;

• steel arch bridge across the Dziwna River with a reinforced concrete mating slab with a length of 170 m;

• steel-reinforced concrete composite structure flyovers with a length of 130 m;

• reinforced concrete viaduct with a length of 55 m.

 

Road works included construction of the following:

• the section of National Road No. 3 with a length of 2.6 kilometres using SMA technology;

• connecting roads, provincial roads, county roads and streets in Wolin - 1.5 km long.

 

• Investor: General Directorate of National Roads and Motorways

• Contractor: Acciona Infrastructura / Mostostal Warszawa S.A.

• Contract value: PLN 64.0 million

• Implementation period: 2002 – 2003