Modernisation and Extension of the Municipal Waste Utilisation Plant in Krosno
The range of work encompassed an increase in the waste acceptance capacity of the landfill site from 28,000 tons to 35,000 tons per year by raising the embankment crown and increasing the capacity of the basin from 500,000 m3 to 700,000 m3, as well as changing the leachate processing technology and planting of trees and bushes in the direct protection zone. As part of the contract, a waste utilisation plant was built, equipped with technological lines for the sorting, pulverising, pressing and baling of waste, along with a yard for compost storage. At the same time, the technological line for processing sludge in the sewage treatment plant existing in the area of the landfill site was modernised.
- Investor: Krosno Commune
- Contractor: Acciona Infraestructuras S.A. / Mostostal Warszawa S.A.
- Contract value: PLN 47.0 million
- Implementation period: 2005-2006.
Selected projects
Faculty of Architecture and Faculty of Engineering Management of the Poznań University of Technology
Total surface:
19 931 m2
Contract value:
71 875 790,22 PLN gross
Completion date:
18 months