General

Indoor swimming pool with connector building in Bydgoszcz

In the scope of the agreement, Mostostal Warszawa is to build an indoor swimming pool with connector building. New swimming pool at Szarych Szeregów will cover an area of 4 000 square meters. Apart from this, construction work includes equipment, technical infrastructure, and landscaping. The three-storey building will be adjoining the Comprehensive Secondary School Complex no. 5 at Szarych Szeregów Street.

Swimming pool in Bydgoszcz will be equipped with two basins, saunas with cold water showers and grandstands for 150 people including 105 seats for the audience and 48 for swimmers and coaches. Main swimming pool with six lanes will cover an area of over 312 square meters, while the recreation basin - 147 square meters. Swimming pool features offer a gentle current of a river, waves, underwater massage, pearl massage and neck massage, geyser, two jacuzzies and a wading pool of 30 cm of depth with water mushroom. Outside the building will be placed 50-metre-long water slide. Fitness room, gym, changing rooms as well as sanitary and utility facilities will be provided on the floor.   

Subject of the agreement: Construction of indoor swimming pool adjacent to ZSO no. 5, Szarych Szeregów Street 4A, Bydgoszcz

Investor: Bydgoszcz City Hall 
Area: 12 029 m
Footprint area: 1 900 m
Net area: 3 969.30 m
Cubic volume: 17 000 m
Number of storeys: 3 (one underground) 
Completion date: 30.11.2018 
Gross contract value: PLN 25 034 416.25

 

Selected projects