The Third Millennium John Paul II Bridge across Martwa Wisła River in Gdańsk

The scope of work included fabrication and assembly of 2 400 tonnes of bridge steel structure with corrosion protection work. Suspension bridge with one pylon. The height of the pylon is 97 m, lenght of the bridge is 381 m and span lenght is 230 m.

  • Investor: GDDKiA Oddział Gdańsk
  • Contractor: Mostostal Puławy S.A
  • Contract value: PLN 22,4 mln
  • Implementation period: 1999–2001
  • Country: Poland
  • Voivodeship: Pomerania