Infrastructure
The Third Millennium John Paul II Bridge across Martwa Wisła River in Gdańsk
The scope of work included fabrication and assembly of 2 400 tonnes of bridge steel structure with corrosion protection work. Suspension bridge with one pylon. The height of the pylon is 97 m, lenght of the bridge is 381 m and span lenght is 230 m.
- Investor: GDDKiA Oddział Gdańsk
- Contractor: Mostostal Puławy S.A
- Contract value: PLN 22,4 mln
- Implementation period: 1999–2001
- Country: Poland
- Voivodeship: Pomerania
Selected projects
Faculty of Architecture and Faculty of Engineering Management of the Poznań University of Technology
Total surface:
19 931 m2
Contract value:
71 875 790,22 PLN gross
Completion date:
18 months