Infrastructure

S7 Załuski-Modlin

Contract value: PLN 635,06 million
Completion date: 45 months

As part of the task, Mostostal Warszawa will prepare a construction project, obtain the necessary decisions, and then build 12 km of the S7 express road with a dual carriageway section with three lanes, which will be built on the site of the current national road No. 7. Two road junctions will be built: Załuski and Ostrzykowizna. A fragment of the new route of national road No. 62 will be built near the Ostrzykowizna junction. In addition, roads parallel to the adjacent area, environmental protection equipment and road safety will be built.

In order to minimize difficulties for drivers, we will carry out construction works without limiting the use of the current road. During the works, drivers will have at their disposal two lanes in each direction. To this end, we will first build a local road system.

Gross contract value: PLN 635,06 million.
Completion date: 45 months; winter periods are included in the design time (i.e. from 15 December to 15 March), winter periods are not included in the works duration (i.e. from 15 December to 15 March).
Payment term: 30 days from the date of receipt of the invoice.
The maximum warranty period is 10 years.
Performance bond: 10% of the gross contract value in the form of a bank guarantee.