Infrastructure

Reconstruction of National Road No. 2 on the Zakręt - Mińsk Mazowiecki section from 495+880 km to 516+550km

Reconstruction of the road with a length of approx. 20.5 kilometres included: demolition works, strengthening pavement, making additional traffic lanes on the main road, construction of bus bays, improving drainage by restoring roadside ditches and construction of a storm water drainage system, construction of a reinforced concrete culvert, repair of the road viaduct over the railway tracks and an access road in the village of Dębe Wielkie.

  • Investor: General Directorate for National Roads in Warsaw
  • Contractor: Mostostal Warszawa S.A.
  • Contract value: PLN 89.7 million
  • Implementation period: 2010 – 2010
Selected projects