Infrastructure
Motorway bridge MA-7 across Warta river in Poznań within A2 Motorway
The North Bridge and the South Bridge consist of two separate structures. The total length of the structure is 321.4 m, the width of each bridge is 18.09 m, and the gap between the bridges of 0.42 m.
- Investor: GDDKiA Branch in Poznań
- Contractor: Fougerolle International / Mostostal Warszawa S.A. / JV Sp. z o.o
- Contract value: PLN 35.8 million
- Implementation period: 2000 – 2001
Selected projects
Faculty of Architecture and Faculty of Engineering Management of the Poznań University of Technology
Total surface:
19 931 m2
Contract value:
71 875 790,22 PLN gross
Completion date:
18 months