Infrastructure

Motorway bridge MA-7 across Warta river in Poznań within A2 Motorway

The North Bridge and the South Bridge consist of two separate structures. The total length of the structure is 321.4 m, the width of each bridge is 18.09 m, and the gap between the bridges of 0.42 m.

  • Investor: GDDKiA Branch in Poznań
  • Contractor: Fougerolle International / Mostostal Warszawa S.A. / JV Sp. z o.o
  • Contract value: PLN 35.8 million
  • Implementation period: 2000 – 2001
Selected projects