Bridge over Wisła River in Płock
The scope of works covered prefabrication and assembly of 7 800 tonnes of brige steel structure. The total lenght of the bridge is 1 200 m.
- Investor: Urząd Miasta Płock, GDDKiA w Warszawie
- Contractor: Mostostal Płock S.A.
- Contract value: PLN 31,9 mln
- Implementation period: 2002–2005
- Country: Poland
- Voivodeship: mazovian