Carrying steel structure of bridge over Wisła River in Puławy
The scope of works entrusted to Mostostal Puławy included fabrication, assembly and corrosion protection work of carrying steel structure of the bridge over Wisła River in Puławy. The investment was realized in the scope of "Construction of I stage ringroad of Puławy of 12,71 km long with construction of new bridge over Wisła bridge in Puławy of 1038,2 m long.
- Investor: Przedsiębiorstwo Robót Mostowych "Mosty Łódź" S.A.
- Contractor: Mostostal Puławy S.A.
- Contract value: PLN 22,57 mln
- Implementation period: 2006–2007
- Country: Poland
- Voivodeship: lubelskie