Acciona Mostostal Warszawa is part of the Acciona Capital Group.

News from construction sites: Progress of work on S19 Rzeszow South-Babica contract

14 April 2023

Please see how work is progressing on the S19 Rzeszow South-Babica contract.

In March 2022, one of the more technologically challenging infrastructure constructions in Poland began. It is an over 10-kilometer section of the S19 expressway between Rzeszow and Babica. The scope of work includes the construction of the first 2.3-kilometer-long tunnel in Podkarpacie.

Almost the entire construction site has already been dehumusified, and earthworks and work on engineering structures are underway. Installation of the "Karpatki," the machine that will begin tunnelling in the third quarter of this year, has begun.

See the video from the last two weeks of work on the southern portal of the tunnel in Babica:


You can read more about the investment here.