Acciona Mostostal Warszawa is part of the Acciona Capital Group.

Galaxy Shopping Centre getting new look

03 March 2017

Mostostal Warszawa will complete works on the extension of the Galaxy Shopping Centre in Szczecin soon. Works are in full swing. After modernisation, the centre shall have the area of 60 000 m2  and therefore will become the biggest entertainment and shopping centre in the region.

This is a project of Echo Investment company, and Western Division of Mostostal Warszawa headed by Marzena Witkowska is general contractor. The scope of works realised by Mostostal Warszawa encompasses demolition a section of existing facility and carrying out the shell stage of the extension. In addition, the company will perform part of installations work such as e.g. underfloor systems, removal of the infrastructure energy collision and strengthening the soil using CMC columns.

Four-storey building with an underground garage will be linked with the existing part of the Galaxy centre. Ultimately, new part of the facility will be arranged in the shape of atrium with inner courtyard that will hold a role of a shopping and meeting place for inhabitants. The centre will be covered with glass dome providing natural daylight.   

The project is situated in the centre of Szczecin. As a result, there isn’t much space for stacking area. What is more, blocks of homes placed nearby don’t make our task any easier. According to the environment decision, we can perform work only between 6 a.m. and 10 p.m. We are trying to realise planned concreting in the evening to stay away from rush hours. Works on the site are progressing fast. The centre is getting new look each day pointed out Jan Domański, contract manager at the extension of the Galaxy centre.

The contract realises Western Division of Mostostal Warszawa headed by Marzena Witkowska and team as follows: Jan Domański (contract manager), Mieczysław Pietrzak (site manager), Wojciech Raducha (work manager), Paweł Wasiluk (work manager), Arkadiusz Staszowski (sanitary work manager), Patryk Szalla (electrical site engineer), Norbert Mierzwa (site engineer), Szymon Mikulski (site engineer), Sylwia Kudełka (project engineer, production preparation specialist), Ewelina Szymborska (agreements specialist), Edyta Przyłoga (financial[&]economic specialist), Grzegorz Żurek (HSE coordinator), Paweł Wróblewski (construction technician), Patryk Kalitowski (site engineer), Norbert Szczęsny (site engineer). 

Realisation of the investment is moving in great steps. Recently, has been completed concreting works of the ceilings of underground and ground floor. The progress of work in February is visible in the pictures. We invite you to see our foto gallery from the site in Szczecin!

Investor: Echo Investment S.A. 
General contractor: Mostostal Warszawa SA
Design:  Open Architekci Sp. z o.o.
Contract value: PLN 28 875 000